english  | Impressum | Datenschutz | Login | Home

iPROGRESS - Internship Program for Young Research Scientists

from Germany and the countries of HAP-associated partners - Argentina, France, The Netherlands, Russia, USA - to work in one of the HAP-related experiments.

The Helmholtz Alliance for Astroparticle Physics (HAP) offers scholarships for young researchers (master and PhD students according to the German university system or equivalent degree) to gain international experience in the field of astroparticle physics.

Young scientists from abroad can apply for a research visit at a German institution and scientists affiliated in Germany for a research visit at an institution in Argentina, France, The Netherlands, Russia, or USA where at least the host institution for the visit is either a HAP member institution, a HAP associated partner or an official collaborator of one of the HAP-related experiments. At the bottom of this page you can see a list of previous iPROGRESS participants.

Applicants must have completed at least 3 years or are master students of a university, or are PhD students or do have an equivalent degree. The period of visit is up to 2 months for a master student and up to 1 month for a PhD student. The scholarship amounts to 650.‐ € per month for a master and to 1,000.‐ € per month for a PhD student, plus a lump sum for travel expenditure of 400.‐ €, or is at least in accordance with the DFG (Deutsche Forschungsgemeinschaft) rules.

Applications consist of a CV together with a project description for the visit coordinated between the candidate, his/her supervisor, and the contact person at the host institute. All documents shall be written in English by the candidate. Prerequisite for an application is good spoken English by the applicant. Applications can be submitted at any time.

The applications shall be submitted (preferably electronically) to the administration of HAP:

Karlsruhe Institute of Technology
Helmholtz Alliance for Astroparticle Physics
Attn.: Dr. B. Keilhauer, IAP
Hermann-von-Helmholtz-Platz 1
76344 Eggenstein-Leopoldshafen
Email: bianca keilhauer ∂does-not-exist.kit edu

We condemn the war in Ukraine. Therefore, we are not accepting fellows/applications from Russia and Belarus at this time.

Download the announcement (PDF) in EN / ES / FR / RU

 

iprogress_number-of-students
Status as of 2023-05

 

Activities of participants of the HAP iPROGRESS programme

Click on the name for a description of his/her project.

Vladimir Samoliga, PhD student

From Irkutsk State University
To KIT - Karlsruher Institut für Technologie

TAIGA | Joint Data Analysis

Fabricio Pablo Alcalde Bessia, PhD student

From Balseiro Institute, Bariloche, Argentina
To KIT - Karlsruher Institut für Technologie

TRISTAN | Development of a Monolithic CMOS Particle Detector

  Pavel Bezyazeekov, Master student

      From   Irkutsk State University
      To       KIT - Karlsruher Institut für Technologie

  Tunka-Rex | Ultra-High Energy Cosmic Rays

  Vasilii Chernov, PhD student

      From   INR - Institute for Nuclear Research RAS
      To       KIT - Karlsruher Institut für Technologie

  ALPS | Advanced Technologies

  Christine Claessens, PhD student

      From   Johannes Gutenberg University Mainz
      To       CENPA, University of Washington

  TRIMS | Tritium Branching Ratio

  Alan Coleman, PhD student

      From   Penn State University
      To       KIT - Karlsruher Institut für Technologie

  Pierre Auger Observatory | Ultra-High Energy Cosmic Rays

  Oleg Federov, PhD student

      From   Irkutsk State University
      To       KIT - Karlsruher Institut für Technologie

  Tunka-Rex | Ultra-High Energy Cosmic Rays

  Nadine Foerster, PhD student

      From   KIT - Karlsruher Institut für Technologie
      To       Université Paris Sud

  EDELWEISS | Dark Matter

  Polina Grigoreva, Master student

      From   INR - Institute for Nuclear Research
      To       KIT - Karlsruher Institut für Technologie

  KATRIN | Sterile Neutrinos

  Yulia Kazarina, PhD student

      From   Irkutsk State University
      To       KIT - Karlsruher Institut für Technologie

  Tunka-Rex | Ultra-High Energy Cosmic Rays

  Sajan Kumar, PhD student

      From   University of Delaware
      To       DESY - Deutsches Elektronen-Synchrotron

  VERITAS | Gamma Rays

  Shivesh Mandalia, PhD student

      From   Queen Mary University of London
      To       Johannes Gutenberg University Mainz

  IceCube | High-Energy Neutrinos

  Axel Müller, Master student

      From   KIT - Karlsruher Institut für Technologie
      To       CENPA, University of Washington

  KATRIN | Neutrino Mass

  Agnes Seher, Master student

      From   KIT - Karlsruher Institut für Technologie
      To       CENPA, University of Washington

  KATRIN | Neutrino Mass

  Aleksei Sheifler, PhD student

      From   Moscow engineering physics Institute
      To       FAU Erlangen

  KM3Net | High-Energy Neutrinos

Vladimir Lenok, PhD student

      From   Irkutsk State University
      To       KIT - Karlsruher Institut für Technologie

  Tunka-Rex SALLA antenna |
  Ultra-High Energy Cosmic Rays

  Flavia Gesualdi, PhD student

      From   ITeDA, Buenos Aires, Argentina
      To       KIT Karlsruhe

  WHISP | Ultra-High Energy Cosmic Rays

Leonard Köllenberger, PhD student

      From   KIT - Karlsruher Institut für Technologie
      To       Lawrence Berkeley National Laboratory (LBNL),

  KATRIN | Neutrino Mass

 

  Genrich Zeller, PhD student

      From   KIT Karlsruhe
      To       UAM Madrid

  KATRIN | Tritium Raman spectroscopy

Sebastian Vetter, PhD student

      From   KIT – Karlsruher Institut für Technologie
      To       Rice University

  XENON | Dark Matter